Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
73,800,000 JPY
Elementary school Nerima City Toyotama Elementary School 710m
Junior high school Nerima City Toyotama Junior High School 1,140m
Supermarket Ozeki Nerima store 200m
Park Nerima City Heisei azalea park 530m
Hospital Ito physician's office 470m
Other facilities 1 Lawson 6, Toyotamakita, Nerima store 130m
Other facilities 2 ココカラファインセガミ Nerima store 210m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, Boiler, waterproofing Bakery replaced for the washing face) (July, 2025) plan Interior (each room cross, floor, housing part, lighting setting) (July, 2025) plan
■ Traffic Access ...
○ A 6-minute walk from Seibu Ikebukuro Line, Seibu Toshima Line, Seibu Yurakucho Line "Nerima" station
○ A 7-minute walk from Toei Oedo Line "Nerima" station
■ Recommended ...
○ 65.25 square meters of exclusive area
○ Terrace 10.98 square meters in area
○ 14 stories the second floor part, 3LDK
○ The end of July, 2025 interior reform construction Complete plan
○ All rooms with flooring
○ There is all rooms storage space
○ Dishwasher, clean water function system kitchen with
○ The bathroom dryer which is comfortable on the rainy day
○ Pets allowed (rules apply)
○ The delivery box that a receipt of the baggage is convenient in the absence
■ Interior reform construction contents (it has been completed in July, 2025)
○ Kitchen replaced with dishwasher, water purifier
○ Bathroom replaced with bathroom dryer
○ Restroom replaced
○ Waterproofing Bakery replaced for a washstand, the washing face
○ Boiler replaced
○ Flooring swap
○ Cross swap
○ Housing part replaced
○ Lighting equipment setting
○ Cleaning
Read More Read Less