Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
69,900,000 JPY
Elementary school Shinjuku City winter sun elementary school 280m
Junior high school Shinjuku City Ushigome third Junior High School 330m
Park Nakamachi Park 180m
Other facilities 1 Tozai Line "Kagurazaka" station 940m
Other facilities 2 Tatsunakacho, Shinjuku-ku library 50m
Other facilities 3 7-Eleven Ushigome Kitamachi store 330m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (April, 2025) plan Interior (each room cross, floor, wall, housing part) (April, 2025) plan
■ Access
○ A 6-minute walk from Toei Oedo Line "Ushigome-Kagurazaka" station
○ A 10-minute walk from Tokyo Metro Yurakucho Line, Namboku Line "Ichigaya" station
○ Tokyo Metro Yurakucho Line, Namboku Line, Tozai Line, a 11-minute walk from Toei Oedo Line "Iidabashi" station
○ A 12-minute walk from Tokyo Metro Tozai Line "Kagurazaka" station
■ Characteristics of the Properties
○ The ventilation is good because of corner unit of Southwest, the Northwest Orientation
○ It is located in the quiet residential area located on the hill
* I begin to see it for 24 hours and am possible
* All rooms with flooring
* Double glazing (LDK, each room)
* Video intercom
* Bathroom ventilation with clothes drying function
* Toilet bowl with warm water flush system for washing user
■ April, 2025 reform history available
* Kitchen replaced
* Bathroom replaced
* Dresser replaced
* Restroom replaced
* Waterproofing Bakery replaced
* Housing part replaced
* Flooring change (LDK, 各所室)
* Wallpaper changed (each room, wall ceiling)
* Floor tile change
* Exclusive possession department hot water supply water supply and drainage pipe update
Read More Read Less