Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
18,000,000 JPY
Elementary school Toride City Toride West elementary school 1,260m
Junior high school Toride City Toride second junior high school 1,140m
Supermarket Seiyu Toride ekimae shop 1,680m
Park Park out of the feather 120m
Hospital Tatsuda doctor's office 120m
Other facilities 1 Welcia Toride Shinmachi store 1,160m
Other facilities 2 atre Toride 1,670m
Other facilities 3 Toride-shi government office 1,110m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (September, 2025) plan Interior (floor) (September, 2025) plan
* September, 2025 Renovated Properties
* It is a 20-minute walk to JR Joban Line "Toride" station
○ It is a 2-minute walk to the bus stop for JR Joban Line "Toride" station bus nine minutes
It is naturalness and beauty and elegance, the house which really fits health, the Properties which is safe, and aims at the house with healing, and was remodeled.
Please give me a sneak preview by all means.
■Reform history (September, 2025 completion)
* An LD: It is a change, door newly installed to a natural stone plastered wall to double flooring made in a change, a ceiling, the wall United States
* A kitchen: I change it to a change, a wall nature stone plastered wall to replaced, double flooring in a system kitchen IH3 Exit, drawer type
* LD side Western-style room: I change it to a change, a closet to a natural stone plastered wall made in a change, a ceiling, the wall United States to double flooring
* About 6.0 quires of Western-style rooms: It is a change, closet replaced to double flooring
* About 4.0 quires of Western-style rooms: Cushion floor replacement, door replaced
* The entrance corridor: It is a change, shoes box newly installed to a natural stone plastered wall made in flooring change, a ceiling, the wall United States
* A restroom: Cushion floor change, the body newly installed, door newly installed, counter New setting
* Gas Boiler newly installed
* A washing face room: Dresser newly installed, waterproofing bread newly installed, door newly installed
* A bathroom: System bus newly installed
Read More Read Less