Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
84,990,000 JPY
Elementary school Observer Elementary School 700m
Junior high school Hamakawa Junior High School 150m
Supermarket My Basket attendance Kawakita shop 220m
Park Higashiooi Park 380m
Hospital けいひん family clinic 200m
Other facilities 1 FamilyMart 3, Higashiooi store 600m
Other facilities 2 Sugi drug Minamioi store 600m
Other facilities 3 2, Higashiooi, Shinagawa post office 200m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, washing faucet, waterproofing bread) (February, 2026) plan Interior (housing part) (February, 2026) plan
-Recommended - of the Properties
▼Access
・A 5-minute walk from Keikyu Main Line "Tachiaigawa" station
・An 8-minute walk from Keikyu Main Line "Samezu" station
・A 12-minute walk from JR Keihin-Tohoku Line "Oimachi" station
・A 12-minute walk from Rinkai Line "Oimachi" station
・A 14-minute walk from Tokyu Oimachi Line "Oimachi" station
・3 station 4 accessible lines possibilities
▼Characteristics of the condominium
・27 Total Units
・1997 September
・The delivery box which can get baggage in absence
・Garbage place in the site
・Tiled exterior tension
▼Characteristics of the room
・13th floor Southwest
・Exposure to the sun is good in a room of the Southwest Orientation
・The ventilation, a view are good because of top floor corner unit
・About 15.0 quires of LDK
・There is abundant storage space
・The island kitchen counter counter kitchen which can look around the room
・Bathroom with the additional heating function
・With clean water machine
▼Reform contents (during a current status reform, it is completed in February, 2026)
・Flooring swap
・Bathroom replaced
・Dresser replaced
・Restroom replaced
・System kitchen replaced
・Wall, ceiling cross replaced
・Housing part, the entrance storing replaced
・Boiler replaced
・Washing faucet, waterproofing Bakery replaced
▼Construction history
・2025 water distribution system change construction
・Corridor, stairs waterproofing construction for 2,023 years for common use
・2023 iron part painting construction
・Repair construction large-scale for 2,022 years
■ We help you find a property that meets your needs For property details or inquiries, please feel free to contact us
Read More Read Less