Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
57,990,000 JPY
Elementary school Observer Elementary School 460m
Junior high school Hamakawa Junior High School 1,100m
Supermarket My Basket Zemusuzaka shop 330m
Park Oi Park 500m
Hospital Internal medicine clinic of asking 160m
Other facilities 1 FamilyMart Higashiooi store 10m
Other facilities 2 Create SD Oi-machi, Shinagawa store 350m
Other facilities 3 Sumitomo Mitsui Banking Ebara Branch 290m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (March, 2026) plan Interior (housing part) (March, 2026) plan
-Recommended - of the Properties
▼Access
・A 4-minute walk from JR Keihin-Tohoku Line "Oimachi" station
・A 4-minute walk from Tokyu Oimachi Line "Oimachi" station
・A 4-minute walk from Rinkai Line "Oimachi" station
・An 8-minute walk from Keikyu Main Line "Aomonoyokocho" station
・2 station 4 accessible lines possibilities
▼Characteristics of the condominium
・23 Total Units
・1985 November
・The delivery box which can get baggage in absence
・With automoatic lock keeping a comfortable living
▼Characteristics of the room
・The seventh-floor Northeast Orientation
・A view is good because of the seventh-floor corner unit
・About 10.8 quires of LDK
・About 4.8 quires of Western-style rooms
・The island kitchen counter counter kitchen which can look around the room
・There is corridor storing
・There is a closet in about 4.8 quires of Western-style rooms
・Intercom working under TV monitor who can confirm the face of the visitor
・Bathroom heating dryer
▼Reform contents (March, 2026 Complete)
・Flooring change
・Bathroom replaced
・Dresser replaced
・Restroom replaced
・System kitchen replaced
・Wall, ceiling cross replaced
・Housing part, the entrance storing replaced
・Boiler replaced
・Washing faucet, waterproofing Bakery replaced
・Water supply and drainage pipe replaced (existing partly)
▼Construction history
・2025 firefighting equipment check indication matter repair work
・2024 service pipe update and water distribution system change construction
・Repair construction large-scale for 2,019 years
・Repair construction large-scale for 2,002 years
■ We help you find a property that meets your needs For property details or inquiries, please feel free to contact us
Read More Read Less