Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
34,990,000 JPY
Elementary school Funabashi City Narashinodai Daiichi Elementary School 780m
Junior high school Funabashi City Narashinodai junior high school 740m
Supermarket York mart Narashinodai store 330m
Other facilities 1 7-Eleven 4, Narashinodai, Funabashi store 160m
Other facilities 2 Funabashi-shi East library 320m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (June, 2024) plan Lower tentative marriage replaced, switch panel replaced, lighting equipment replaced, air-conditioner precedent Water Pipes, die knock construction (the entrance door, sash), pleats screen door cleaning, lace curtain installation, house cleaning (June, 2024) plan, Interior (entirely) (June, 2024) plan
■ Access ━━━━━━━━━━━━━━━━ ...
○ A 9-minute walk from Keisei Electric Railway Matsudo Line "Narashino" station
○ A 12-minute walk from Keisei Electric Railway Matsudo Line "Kitanarashino" station
○ A 13-minute walk from Toyo Rapid Railway "Kitanarashino" station
■ Recommended ━━━━━━━━━━━━ ...
○ 2000 (Heisei 12) July
○ Corner unit of West, the North
○ 3LDK of 80.06 square meters of exclusive area
○ A certain space bathroom of 1418 size, with bathroom dryer
○ Island kitchen counter to be able to enjoy a conversation while cooking
○ With dishwasher which the washing time can shorten
○ Intercom with TV monitor which is reliable in a visitor
○ With automoatic lock keeping a comfortable living
○ The delivery box which baggage can get even in absence
○ An important pet and condominium (there is detailed regulations) which can live
■ Reform contents (June, 2024 enforcement) ━━━━━ ...
○ Wall, ceiling cross swap ○ flooring swap
○ Floor tile swap ○ System kitchen replaced
○ Bathroom replaced ○ Boiler replaced
○ Water supply hot water supply pipe, drainage pipe replaced ○ waterproofing Bakery replaced
○ Dresser mirror replaced ○ Restroom replaced
○ Screen door swap, some replaced ○ lower tentative marriage replaced
○ Housing part replaced ○ Switch panel replaced
○ Lighting equipment replaced ○ Air-conditioner precedent Water Pipes
○ Die knock construction (the entrance door, sash)
○ Pleats screen door cleaning
○ Lace curtain installation ○ house cleaning etc.
Read More Read Less