Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
129,900,000 JPY
Elementary school Municipal Ogi Bridge Elementary School 260m
Junior high school Municipal Fukagawa fourth junior high school 520m
Other facilities 1 Sumiyoshi Station (Tokyo Metro Hanzomon Line) 760m
Other facilities 2 Matsumotokiyoshi matsukiyoLAB 3, Shirakawa store 640m
Other facilities 3 Tomod's drugstore Ogi Bridge shop 660m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (September, 2026) plan Interior (each room cross, floor, wall, housing part) (September, 2026) plan
■Recommended
・2 station 3 accessible lines possibilities
★A 10-minute walk from Toei Shinjuku Line, Tokyo Metro Hanzomon Line "Sumiyoshi" station
★A 13-minute walk from Tokyo Metro Hanzomon Line, "Kiyosumi-Shirakawa" station
・3LDK, 5th floor part of 64.90 square meters of exclusive area
・ORIX Real Estate, three original developer of etc. major
・Big community of 365 Total Units
・It is gets plenty of sunlight in Facing South terrace
・I secure storage space in all rooms
・Western-style room available of with walk-in closet
・Island kitchen counter system kitchen (dishwasher available)
・Bathroom ventilation with clothes drying function available
・2013 July (2013 July)
・Pets allowed (rules apply)
・Concierge service
・24 hours a day, every day manned management (night security)
・Double automoatic lock with the entrance monitor for common use
■September, 2026 interior reform Complete
* Boiler replaced
* System kitchen replaced
* Bathroom replaced
* Dresser replaced
* Restroom replaced
* Each room wallpaper changed
* Each room flooring change
* Housing part replaced
* Floor tile change
* Each room lighting setting
* House cleaning
Read More Read Less