Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
31,800,000 JPY
Elementary school Municipal Sunacho elementary school 270m
Junior high school The fourth municipal Sunacho junior high school 820m
Supermarket Sale tag temple Sunacho store 350m
Park Sunacho Chuo Park 170m
Hospital Fujisaki Hospital 540m
Other facilities 1 FamilyMart 4, Kitasuna, Koto store 260m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (April, 2026) plan Interior (each room cross, floor, wall, housing part) (April, 2026) plan
■Recommended
○About 14-minute walk from Tokyo Metro Tozai Line "Minamisunamachi" station
○About 21-minute walk from Toei Shinjuku Line "Oshima" station
○Exclusive area 54.00 square meters /2SLDK
○9th floor part/West Orientation
○The middle of April, 2026 reform Complete plan (please refer to the following for the details)
* I leave the sliding door of the western Western-style room open and can use it as extensive LDK
○The island kitchen counter system kitchen which bounds of the conversation
* Air-conditioner one setting
* BIC community of 526 Total Units
* There is delivery box
* An elementary school, park neighborhood is near, and child care environment is good
■Reform contents (going to be completed in the middle of April, 2026)
* System kitchen replaced (faucet with water purifier)
* Bathroom replaced (belonging to a bathroom ventilation with clothes drying function ability, additional heating function)
* Washstand replaced
* Restroom replaced (washing function toilet seat with)
* Flooring change (LDK, living room)
○Floor tile change (washing face, restroom)
* Wallpaper changed (each room)
* Housing part replaced
* Shoe cupboard replaced
* Air-conditioner one setting
* Ceiling downlight replaced
* Outlet plate replaced
* Various faucet replaced
* Boiler replaced
* Insulation material construction
Read More Read Less