Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
144,800,000 JPY
Elementary school The fourth municipal Sunacho elementary school 400m
Junior high school The second municipal Minamisuna junior high school 430m
Supermarket My Basket 2, Minamisuna store 370m
Park Sendaibori River Park 40m
Other facilities 1 7-Eleven Minamisuna, Koto Kasaibashi-dori St. shop 170m
Other facilities 2 Authority of Lawson Minamisuna Kasai Bridge shop 350m
Other facilities 3 アリオ Kitasuna 710m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, wall, housing part) (December, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (December, 2025) plan
■ Recommended
━━━━━━━━━━━━━━━・・...
○ A 15-minute walk from Tokyo Metro Tozai Line "Minamisunamachi" station
○ A 16-minute walk from Tokyo Metro Tozai Line "Toyocho" station
○ 87.16 square meters of /4LDK
○ Top floor the thirteenth floor part, Southwest Orientation corner unit
○ A view, exposure to the sun is good
○ Two terrace
○ There is floor heating to a living and dining room part
○ Island kitchen counter system kitchen (dishwasher available)
○ Storage space enhancement
・Closet of each Western-style room
・Shoe closet
・Storage room
* Pets allowed (there is detailed regulations)
○ There is a convenience store supermarket within the range of a 5-minute walk and is convenient for shopping
■ Reform contents (December, 2025 Complete)
━━━━━━━━━━━━━━━・・...
○ System kitchen replaced (with a dishwasher)
○ Bathroom replaced
○ Dresser replaced
○ Waterproofing Bakery replaced
○ Restroom replaced (toilet bowl with warm water flush system for washing user restroom with)
○ Boiler replaced
○ Lighting equipment replaced
○ Housing part replaced
○ Flooring change (LDK, Western-style room, corridor)
○Floor tile change (the entrance, washing face, restroom)
○ Wallpaper changed (each room)
○ House cleaning
Read More Read Less