Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
144,000,000 JPY
Elementary school Setagaya City Kyoto West elementary school 570m
Junior high school Setagaya City Yoga Junior High School 630m
Park 2, Tamagawadai park 360m
Hospital Tamagawa Hospital 1,060m
Other facilities 1 7-Eleven Yoga interchange store 170m
Other facilities 2 cocokara fine Yoga store 690m
Other facilities 3 Yoga ekimae post office 570m
■ Access
○ An 8-minute walk from Tokyu Denentoshi Line "Yoga" station
■ Overview
○ Exclusive area: 81.67 square meters
○ Plan: 2SLDK
○ 12-story the eighth-floor part
○ 2002 January
○ Daikyo Astage Incorporated management
○ DAIKYO Inc. original developer
■ Strong points
○ I can appreciate terrace からたまがわ fireworks festival (※ depends on the weather)
○ The view per positive is good because of a Facing South dwelling unit
○ About 18.2 quires of extensive LDK
○ Floor heating is equipped with a gas warm water type to an LD
○ Kitchen with a dishwasher
○ Bathroom heating dryer, additional heating bathroom with a function
○ It has been installed one air-conditioner
○ With about 1.42 square meters of alcoves
○ There is the delivery box which is convenient in absence
○ Pets allowed (there is detailed regulations)
○ The end of April, 2026 reform Complete plan
■ Reform contents (going to be completed in the end of April, 2026)
○ System kitchen replaced
・Artificial marble counter, dishwasher, glass TOP cooker range hood
○ Bathroom replaced
・Bathroom heating dryer
○ Restroom replaced
・Washlet, hand-washing device, corner storing
○ Dresser replaced
・Triple mirror
○ Wall, ceiling wallpaper changed
○ Floor flooring swap
○ Internal housing part replaced
○ Gas warm water type floor heating replaced (LD)
○ Air-conditioner one setting
○ Exclusive possession department Water Pipes update
○ Boiler replaced
○ Indirect lighting replaced
Read More Read Less