Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
102,900,000 JPY
Elementary school Ota City Koike Elementary School 720m
Junior high school Ota City shell mound Junior High School 630m
Supermarket Life Kamiikedai store 340m
Park Kamiikedai Imizu Hill park 160m
Hospital Couple Hill clinic 200m
Other facilities 1 AEONTOWN Co., Ltd. Hatanodai 1,200m
Other facilities 2 FamilyMart 4, Kamiikedai, Ota store 390m
Other facilities 3 FamilyMart Kamiikedai couple Hill store 380m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (April, 2025) plan Interior (each room cross, floor, wall, housing part, air-conditioner new establishment) (April, 2025) plan
■Access ... ・
* A 10-minute walk from Tokyu Ikegami Line "Nagahara" Station
* A 14-minute walk from Tokyu Oimachi ・ Ikegami Line "Hatanodai" Station
* A 13-minute walk from Toei Asakusa Line "Magome" Station
■Recommended ... ・
* System kitchen with a dishwasher
* LDK about 18.5 tatami and spacious relaxing space (LD floor heating laying)
* We do not have to worry about the washing with bathroom dryer on the rainy day
* With toilet bowl with warm water flush system for washing user which is comfortable in the restroom
* I am belonging to storage space in each room including WIC of the Western-style room
* As there is delivery box, a receipt of the baggage is possible of absence
* Condominium (there is detailed regulations) which can live with an important pet
* The security is Automoatic lock of the relief, too
* Because of Top Floor ・ 3 Corner Unit, an exposure to the sun ・ ventilation ・ view is good
* With use of storage room right
■Renovation contents (April, 2025 Complete) ...
* System kitchen replaced
* Bathroom replaced
* Restroom replaced
* Dresser replaced
* Housing part replaced
* Boiler replaced
* Flooring swap
* Cross swap
* Lighting equipment replaced
* One air-conditioner is new
* Floor heating mat new establishments
Read More Read Less