Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
318,000,000 JPY
Elementary school Meguro City Gohongi Elementary School 480m
Junior high school Meguro City Meguro Chuo junior high school 280m
Supermarket My Basket 2, Chuocho store 220m
Park Aburamen Park 590m
Hospital Meguro Hospital 170m
Other facilities 1 Yutenji Station (Tokyu Toyoko Line) 670m
Other facilities 2 Gakugeidaigaku Station (Tokyu Toyoko Line) 930m
Other facilities 3 FamilyMart Meguro Nakamachi shop 170m
Kitchen replaced Bathroom replaced Restroom replaced Floor replaced Boiler replaced Door replaced
Interior (floor, wall, housing part, lighting equipment) (September, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, Boiler) (September, 2025) plan
■Access
* A 9-minute walk from Tokyu Toyoko Line "Yutenji" station
* A 12-minute walk from Tokyu Toyoko Line "Gakugeidaigaku" station
■Recommended
* Corner unit with three open sides of the Northeast West
* September, 2025 renovation Properties
* Roof balcony of 30.31 square meters, terrace available of 13.76 square meters
* House of the 3LDK that storage space was established in all rooms
* 1 tsubo or more extensive bathrooms
* A view is good for a 12-story bldg. 11th floor part
* Dwelling unit (two) belonging to WIC which is available for large-capacity storing
* Pets allowed (breeding rules apply)
* Exclusive possession storage room available (free)
* Automoatic lock available
* Elevator available
* The delivery box available which is available for the receipt of goods in the absence
* I can overlook a row of cherry blossom trees from cherry blossoms lounge of the 1st in spring
* The facilities which are convenient for a supermarket and a convenience store, the life including the park are substantial in the neighborhood
■Renovation contents (September, 2025 Complete) ...
* Kitchen replaced
* Bathroom replaced
* Restroom replaced
* Housing part replaced
* Lighting is new
* Pantry new establishment
* Counter new establishment
* Cross replaced
* Floor entire surface swap (use of some tiles)
* Boiler replaced
* I have been cleaned etc...
Read More Read Less