Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
16,490,000 JPY
Elementary school 向台小学校 1,070m
Junior high school Ushiku South junior high school 1,530m
Supermarket Coop うしく shop 1,110m
Park Midorino second children's park 80m
Hospital The Temma stomach and intestines department clinic 850m
Other facilities 1 Lawson Ushiku South shop 440m
Other facilities 2 Welcia Ushiku Kamiya shop 1,140m
Other facilities 3 Midorino, Ushiku post office 400m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (entirely) (April, 2026) plan Exterior (outer wall, roof) (April, 2026) plan, Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (April, 2026) plan
-Recommended - of the Properties
▼Location
・Residential area of a 23-minute walk from Joban Line "Ushiku" station
・It is Abutting road in the public road of Southeast side width about 6.0m
・The environment where the ventilation is good for in gets plenty of sunlight
・The front road is wide; of the car is easy to go in and out
・A supermarket and a convenience store are prepared within the range of Walk
▼Characteristics of the building
・4LDK of the total floor area about 34.44 tsubo
・Atmosphere calm by the Japanese-style appearance
・There is it for two parking space (Depending on car type)
・The comings and goings that the entrance porch was unhurried widely
▼Facilities
・There is a window in about 17.5 quires of LDK in Northwest, Southwest
・It is equipped with about eight quires of Western-style rooms and restroom, bathroom, washing face room in 1st
・About ten quires of Western-style rooms, Western-style room about six quires are two rooms and restrooms in 2nd floor
・I secure storage space in each floor
■Reform contents (going to be completed in April, 2026)
・System kitchen replaced
・Bathroom replaced
・Restroom replaced
・Boiler replaced
・Intercom setting
・Fire alarm setting
・Lighting equipment replaced
・Key distribution
・Cross washing and stretching
・Floor flooring tension
・White ant prevention construction
・House cleaning
・Parking lot expansion
・The roof painting
・Exterior painting
・The planting pruning
・Garden tree felling
・Leak check
Read More Read Less