Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
23,990,000 JPY
Park Medium point units park 402m
Other facilities 1 Drug Store SEIMS Ome Kawabe 6 chome shop 371m
Kitchen replaced Restroom replaced Dresser replaced Floor replaced
Bathroom cleaning (September, 2026) plan Exterior (outer wall, roof, outward appearance) (September, 2026) plan, Interior (floor, wall, lighting, intercom) (September, 2026) plan, Place equipped with a water supply (kitchen, restroom, washroom) (September, 2026) plan
-Recommended - of the Properties
▼Location
・Location of about 13-minute walk from JR Ome Line "Kawabe" station
▼Characteristics of the building
・Wood 2-story bldg. 3LDK
・There is it for one Parking lot (Depending on car type)
▼Characteristics of the room
・About 17.5 quires of LDK where extensive space spreads out, and are felt an open feeling
・Three rooms of the 1st more than all about six quires of Western-style rooms
・With all rooms storing to be able to use each room for clearly
・About 4.5 quires of Japanese-style rooms are available for usage depending on a use
▼Facilities
・The moisture after the bathing that it is apt to be full of only by a ventilation fan assists natural ventilation by opening a window
・The Dresser that it is installed in a dressing room and is easy to use at the time of before and after bathing and getting up
・With toilet bowl with warm water flush system for washing user which is comfortable in the 1.2 floor restroom
・The environment where laundry is easy to dry for good Facing South terrace of the exposure to the sun
▼Reform contents (going to be completed in around the beginning of September, 2026)
・Ant-proof construction of the outward appearance
・The outer wall roof painting
・System kitchen replaced
・Dresser replaced
・Restroom replaced (1/2 floor) with shower
・Floor tile 重張, wallpaper changed, CF swap (restroom, washing face)
・Lighting replaced
・Intercom replaced
・Bathroom cleaning
Read More Read Less