Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
104,800,000 JPY
Elementary school Setagaya-ku Tatematsu hill Elementary School 80m
Junior high school Setagaya City Tsurumaki junior high school 510m
Supermarket My Basket Uwamachi, Setagaya store 380m
Park Setagaya Shinmachi Park 860m
Other facilities 1 7-Eleven Setagaya Komadome street shop 250m
Other facilities 2 FamilyMart Setagaya education Hall prev shop 310m
Other facilities 3 Setagaya one post office 370m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, water supply and drainage pipe, Boiler) (July, 2025) plan Interior (each room cross, floor, wall, housing part, house cleaning) (July, 2025) plan
■ Traffic Access ━━━━━━━━━━━━ ...
○ A 12-minute walk from Tokyu Denentoshi Line "Sakurashimmachi" station
○ A 7-minute walk from Tokyu Setagaya Line "Kamimachi" station
○ A 12-minute walk from Tokyu Setagaya Line "Setagaya" station
■ Recommended ━━━━━━━━━━━━
○ New full renovation (going to be completed in the end of July, 2025)
○ 102.05 square meters of exclusive area, 3SLDK
○ Exposure to the sun, the ventilation is good because of top floor, corner unit
○ A certain about 20.0 quires of space LDK
○ Abundant storage space
○ 2 bowl washstands which prevents congestion in the case of outfit
■ Renovation contents (going to be completed in the end of July, 2025) ━━━ ...
○ Plan change (4LDK → 3SLDK)
○ Flooring floor tile change
○ Ceiling, wall wallpaper changed
○ Housing part replaced
○ System kitchen replaced
○ Air-conditioner one replaced (LDK)
○ Bathroom replaced (with a bathroom heating dryer)
○ Restroom replaced
○ Faucet, washing waterproofing Bakery replaced for the washing
○ Lighting equipment replaced
○ Gas Boiler replaced
○ Water supply and drainage pipe update construction
○ The entrance storing replaced
Read More Read Less