Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
144,980,000 JPY
Elementary school Setagaya City Komazawa Elementary School 1,100m
Junior high school Setagaya City Komazawa Junior High School 1,300m
Supermarket Super Ozeki Nozawa shop 290m
Park Higashine Park 610m
Hospital Incorporated administrative agency national hospital mechanism Tokyo medical center 980m
Other facilities 1 Natural Lawson 3, Kamiuma shop 340m
Other facilities 2 Tomod's Komazawa ekimae shop 270m
Other facilities 3 Kamiuma, Setagaya post office 450m
Each room cross/wall papering substitute Restroom replaced Floor replaced Boiler replaced
Interior (each room cross, floor, house cleaning) (October, 2025) plan Place equipped with a water supply (restroom, Boiler) (October, 2025) plan, Exterior (outer wall) (October, 2025) plan
■ Access
○ A 7-minute walk from Tokyu Denentoshi Line "Komazawa Daigaku" station
○A 19-minute walk from Tokyu Denentoshi Line "Sangen-jaya" station
* Tokyu Toyoko Line Jiyugaoka Station bus 15 minutes 2, Higashigaoka 7 min walk
■ Recommended
▼Building
○ Order house of 2013 November, LDK marble specifications
○ New interior reform enforcement (October 6, 2025)
* Use, master bedroom is カーペ in materials pure on the floor of the second-floor corridor, Western-style room
ト caution money
* The roof roof balcony of about 8.69 square meters
○ Exposure to the sun is good in a Southeast road
▼Room
○ Extensive LDK of about 23.5 tatami
○ Living studding 3.1M
○ It is floor heating in living and dining room
○ LDK, washing face, restroom floor marble specifications
○ Large-scale shoes ink roque
○ UB of 1820 size with bathroom TV
○ Fixtures Dresser W1, 800mm of top plate marble specifications
○ The living wall surface is a Stone-flagged accent design
○ It is equipped with a closet in each Western-style room, and storing is fulfilling
■ Reform contents
○ Boiler two replaced
○ Each room cross washing and stretching
○ Restroom newly installed (1st, 2nd floor)
○ 1st marble part repair repair
○ 2nd floor master bedroom carpet washing and stretching
○ Outer wall cleaning
○ Roof New washing and stretching construction
○ Roof balcony waterproofing construction
○ House cleaning
Read More Read Less