Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
118,000,000 JPY
Elementary school Setagaya City Fukazawa Elementary School 940m
Junior high school Setagaya City Fukazawa Junior High School 1,200m
Supermarket Summit store Fukazawa Fudomae store 820m
Park Komazawa Olympic Park 480m
Other facilities 1 Lawson Komazawa Olympic Park prev shop 300m
Other facilities 2 Tomod's Komazawa shop 390m
Other facilities 3 Sugi drug Fukazawa shop 780m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, wall, housing part) (October, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (October, 2025) plan
■ Traffic Access ━━━━━━━━━━━━━━━
○A 16-minute walk from Tokyu Denentoshi Line "Komazawa Daigaku" station
○A 23-minute walk from Tokyu Denentoshi Line "Sakurashimmachi" station
○Ebisu station / Yamanote Line bus 35 minutes "junior high school attached to the arts and sciences" 4 min walk
■ Recommended ━━━━━━━━━━━━━━ ...
○ Horizontal placing Parking lot with exclusive usage rights under the ground
○ October, 2025 reform Complete finished
○ About 17.5 quires of extensive LDK
○ With floor heating warming the room from the step (LD)
○ Island kitchen with a feeling of opening
○ I shorten time for washing and am with a tableware washing dryer
■ Reform contents (October, 2025 Complete)
○ System kitchen replaced
○ Water purifier, tableware washing dryer
○ Bathroom setting (bathroom ventilation drying heating machine, bathroom TV, additional heating)
○ Dresser replaced
○ Restroom replaced (toilet bowl with warm water flush system for washing user)
○ Floor heating setting (LD)
○ Service pipe, hot water supply pipe replaced
○ Housing part replaced
○ Flooring change
○ Each room wallpaper changed
Read More Read Less