Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
438,000,000 JPY
Each room cross/wall papering substitute Restroom replaced Boiler replaced Door replaced
Interior (each room cross, housing part) (September, 2025) plan Place equipped with a water supply (restroom, Boiler) (September, 2025) plan
A certain dignity appearance ... to harmonize in the quiet residence street of ... 4, Minamiazabu
■ Grand-Suite Hiroo
○ Marubeni Corporation original developer
○ 108 Total Units
○ Access flat to station
○ 2014 (Heisei 26) March
○ The wall of the natural stone with high formality covers outside eyes,
Approach leads it to the private space
○ Opening-like lounge space of the 2-layer colonnade
○ Four folds of security
○ Hotel-like inner corridor design
○ Delivery box
○ Trash collection area 24H available
■September, 2025 reform Complete
●All cross swap ●Ceiling cassette air conditioner newly installed (four)
●Boiler replaced ●Shower & hose & faucet newly installed
●Kitchen faucet replaced ●Kitchen cooker replaced
●Disposer replaced ●The washstand door painting
●The restroom washstand door painting ●Water purifier cartridge replaced
●Waterproofing Bakery replaced ●Restroom replaced etc.
Read More Read Less