Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
27,900,000 JPY
Elementary school Forest Elementary School of the Sapporo-shi shrine 1,000m
Junior high school Sapporo City First Higher School Junior High School 780m
Park Forest jumbo park of the shrine 640m
Other facilities 1 Subway Tozai Line "Nishinijuhatchome" station 760m
Other facilities 2 Subway Tozai Line "Maruyama-koen Park" station 920m
Other facilities 3 Tsuruha drug North Maruyama shop 610m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe) (October, 2025) plan Interior (floor, wall, housing part) (October, 2025) plan
■ Overview
○ Mitsui Fudosan Co.,Ltd. original developer
○ The end of October, 2025 reform Complete
○ It is a 10-minute walk to Subway Tozai Line "Nishinijuhatchome" station
○ 4LDK of 92.80 square meters of exclusive area
○ 5 stories the first floor part
○ The sun, the ventilation is good for Southwest Orientation
○ With right to use for exclusive use of the Parking lot
○ Pets allowed (use rules apply)
○ A storage room 1 division is available free of charge
○ Forest Elementary School of the shrine, First Higher School Junior High School precinct
○ The life convenience facilities such as supermarket convenience store drugstores scatter within the range of a 10-minute walk
■ Reform contents (the end of October, 2025 Complete)
○ System kitchen (with W2550 dishwasher)
○ Restroom (belonging to a toilet bowl with warm water flush system for washing user)
○ Bathroom (with a 1216, ventilation drying heating machine)
○ Washing face room (Dresser, waterproofing bread with shower)
○ Lighting equipment, housing part replaced
○ Wallpaper changed
○ Flooring change (LDK, Western-style room, corridor)
○ Floor tile change (the entrance, washing face room, restroom)
○ Hot water supply Facilities (with Boiler, additional heating, multi-remote control)
○ Water Pipes replaced
○ Indoor cleaning
Read More Read Less