Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
24,900,000 JPY
Elementary school Sapporo City Nijo elementary school 630m
Junior high school The morning star junior high school 1,510m
Supermarket Food market Maruyama shop 850m
Park The back of Maruyama Sando park 290m
Other facilities 1 SUNDRUG Minami-4-jo store 100m
Other facilities 2 FamilyMart Hokusei Gakuen girls' high school prev shop 270m
Other facilities 3 Minami-1-jonishi, Sapporo post office 430m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (April, 2026) plan Interior (each room cross, floor, wall, housing part) (April, 2026) plan
―The Lions Mansion Maruyama second―
▼Location
Everyday shopping and business smoothly
Life convenience facilities are comfortable Location within the range of a 10-minute walk
▼Characteristics of the condominium
・Relief, safe auto-lock system to keep a living
・The electric water heater that the hot water supply is kind to the family budget by energy saving
・Pets allowed (there is a limit by the detailed regulations)
▼Recommended
・The island kitchen counter system kitchen which I can cook while watching the smile of the family
・Facing South living and dining room full of a feeling of opening that warm sunlight fully touches
・Three shares of convenient gas rings which grants reduction of working hours by cooking at the same time
・I reduce a burden of the washing, and there is a dishwasher to be able to rely on which has days, and produces a space
・The house where includes storing in the each room, and has good daily livings clearly
▼Reform contents (the end of April, 2026 Complete)
・System kitchen replaced
・Bathroom replaced
・Dresser replaced
・Dishwasher replaced
・Restroom replaced
・Water Pipes update
・Electric water heater replaced
・Cross entire surface change
・House cleaning
Read More Read Less