Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
620,000,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (November, 2026) plan Interior (each room cross, floor, housing part) (November, 2026) plan
■ Indoor reform (going to be completed in the end of October, 2026)
・System kitchen replaced
・Bathroom replaced
・Restroom replaced
・Dresser replaced
・Flooring swap
・Cross swap
■ Characteristics of the condominium
○ Tokyu Land Corporation etc. original developer, Takenaka Corporation construction
○ Low-E Pair glass adoption proud of 遮熱, insulation performance
○ Double flooring, double ceiling Structure
○ There is dust Station in each floor (Trash collection area 24H available ability)
○ 24-hour on-site management (night security correspondence) by Mori Building
* Concierge service
■ Full common facilities (fees may be charged for some services)
○ Grand lobby
○ Aqua site lounge
○ Cardinal lounge
○ Luxury library
○ Relaxation room
○ Meditation salon
○ Guest room [harmony, reverence, purity and tranquility] [tops eat]
○ Top floor: TOP lounge (restaurant perfection)
Read More Read Less