Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
468,000,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (October, 2025) plan Interior (each room cross, floor, wall, housing part) (October, 2025) plan
■Indoor interior Renovated (October, 2025 Complete)
* Bathroom replaced
* System kitchen replaced
* Dresser replaced
* Restroom replaced
* Flooring swap
* Ceiling, wall wallpaper changed
* Housing part, storing door replaced
* Gas Boiler replaced
* Base board replaced
* Downlight replaced
◆2009 (Heisei 21) February
◆・Nomura Real Estate Development original developer, TAISEI Co., Ltd. construction
◆414 Total Units
◆Vibration Control Structure, high-strength concrete adoption
◆The Front service concierge staff:
Moon ... day 8:00 - 20:00
◆A manager: Moon ... day 8:00 - 20:00, a guard: Moon ... day 20:00 - 8:00
◆24-hour on-site management
◆Hotel-like inner corridor design
◆There is delivery to home BOX
◆Pets allowed (there is the limit by terms)
◆There is each floor garbage place
Read More Read Less