Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
109,800,000 JPY
Elementary school The third municipal Hino Elementary School 440m
Junior high school Municipal Hino Gakuen compulsory education school 1,540m
Park Garden of the Shinagawa City ねむの tree 340m
Hospital Higashigotanda Ikedayama clinic 560m
Other facilities 1 Meguro ekimae post office 480m
Other facilities 2 FamilyMart nature education garden prev shop 420m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (October, 2025) plan Interior (each room cross, floor, housing part) (October, 2025) plan
■ Access
○ A 10-minute walk from JR Yamanote Line "Meguro" station
* A 10-minute walk from JR Yamanote Line "Gotanda" station
* A 11-minute walk from Tokyo Metro Namboku Line "Shirokanedai" station
■Recommended
* The low-rise building Residence which stands still in "the Ikedayama" which is a corner of the Jonangozan
* Top floor the third floor part, Facing South dwelling unit
* 54.73 square meters of exclusive area, Plan of 2LDK
* An LD, a Western-style room adopts a ceiling implantation downlight together
The room with a feeling of opening has good ventilation per positive
* A certain about 12.3 quires of space LDK
* Pets allowed (there is breeding detailed regulations)
* There is plane-type Parking lot underground (as of October 31, 2025 available)
* It is located in the quiet residential area of the venerable Ikedayama,
The cityscape which feels green in the Central Tokyo including a garden and the Ikedayama park of the ねむの tree
* Approach flat in Meguro Station and the Shirokanedai Station area
■Reform contents (it has been completed in October, 2025) ━━━━━━━━━━━━━ ...
* Bathroom newly installed (with the bathroom dryer)
* Warm water washing function restroom newly installed belonging to
* System kitchen newly installed
* Boiler newly installed
* Dresser newly installed
* Washing bread, faucet newly installed
* Housing part newly installed
* Cross re-covering
* Flooring re-covering
* Room cleaning etc.
Read More Read Less