Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
19,800,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, wall, housing part) (July, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (July, 2025) plan
[Recommended]
■There are corner unit, a bay window (2 places).
■A top floor part, exposure to the sun, a view are good.
■There is a window, and a bathroom, the restroom can ventilate it.
■The north side terrace has storing.
[July, 2025 renovation completed]
・With Peninsula kitchen new making (belonging to Dishwasher and dryer) cupboard
・Bathroom (1317 size) new making (with the bathroom heating dryer)
・Dresser new making, restroom new making, wall cross each room new making
・Flooring swap (LDK, each Western-style room, corridor), all housing part replaced
・I put CF swap (washing face room, restroom), the entrance floor tile
・Gas Boiler replaced
Read More Read Less