Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
258,000,000 JPY
Elementary school Minato City Imperial rice field Elementary School 620m
Supermarket Peacock store Takanawa fish basket Hill store 140m
Other facilities 1 Seven-Eleven 1, Shirokane, Minato-ku South store 310m
Each room cross/wall papering substitute Kitchen replaced Restroom replaced Dresser replaced
Interior (each room cross) (June, 2025) plan Place equipped with a water supply (kitchen, restroom, washroom) (June, 2025) plan
■ Characteristics of the room
○ Layout of 56.70 square meters of exclusive area, 2LDK+WIC+SIC
○ 29th floor part Southwest Orientation dwelling unit
○ It overlooks Mount Fuji from terrace (depends on the weather)
○ Maximum studding about 2,500m (LD, Western-style room, WIC)
○ Floor heating available (LD, Western-style room)
○ Abundant storage space such as WIC, SIC, corridor storing
■ Premist Tower Shirokane Takanawa
○ The November, 2022 completion
○ 35 stories above the ground, large-scale Tower Residence of 280 Total Units
○ Good location of a 1-minute walk from Tokyo Metro Namboku Line, Toei Mita Line "Shirokane Takanawa" station
○ To the "Shirokane Takanawa" station Exit 2, I approach Flat without crossing the signal
○ DAIWA HOUSE INDUSTRY Co., Ltd. sale in lots "Premist" series
○ I adopt control on vibration Structure reducing the shaking at the time of the earthquake effectively
○ Concierge service available (fees may be charged for some services)
○ 24-hour on-site management (night security)
○ Each floor garbage place available, 24 hours garbage soup stock possibility
○ Various common use department available (fees may be charged for some services)
(3F) ・Bright lounge
・Rise lounge
・Owners kitchen
(B2F) ・Owners salon
■ Renovation contents (the middle of June, 2025 Complete)
○ Each room wallpaper changed
○ Gas ring new replaced
○ Toilet new replaced
○ Washing Bakery replaced
○ (kitchen, washing face, restroom) faucet replaced
Read More Read Less