Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
160,000,000 JPY
Elementary school Yokohama City Edahigashi Daiichi Elementary School 700m
Junior high school Yokohama City Edaminami junior high school 1,000m
Supermarket My Basket Edaminami store 400m
Hospital The northern part of Showa University Yokohama-shi Hospital 1,300m
Other facilities 1 MINISTOP 4, Edaminami, Tsuzuki store 350m
Other facilities 2 Tsuzuki-ku, Yokohama-shi government office 1,500m
Bathroom replaced
Place equipped with a water supply (bathroom) (September, 2016) plan
■ Access
・Tokyu Denentoshi Line "Eda Station" 15-minute walk
・Yokohama Shiei Subway Blue Line "Center-Minami Station" 23-minute walk
■ Recommended ━━━━━━━━━━━━━ ...
・The premium residence where the building beauty and a beautility of the Mitsui Home construction harmonize with
・257.06 square meters of Land area (about 77.76 tsubo)
・4LDK of 188.90 square meters of total floor area (about 57.14 tsubo)
・Uniform comfort of the whole house which "all the buildings air-conditioning system" brings
・Good-quality interior and Hikari based on white are rich openings around the space
・Luxurious design of "a front yard of the Hall for state ceremonies" and "the courtyard" balancing privacy with the change of the four seasons
・A certain each room more than six space room
・About each room two lighting per ventilation, positive is good
・The living becomes the stairwell, and there is a feeling of opening
・The L-shape island kitchen counter which enjoys the conversation with the family, and is convenient
・Two washing face bowls which outfit is not covered, and is available for the family same time
・The residential area that is quiet because of Category 1 Low-Rise Exclusive Residential District
・There is two Parking lot space (Depending on car type)
■ Reform contents
・January, 2016: City gas new construction
・September, 2016: Bathroom remodeling construction
・October, 2016: The tenth year building collective maintenance construction (waterproofing, exterior)
・October, 2016: Pantry (the storage of food) remodeling construction
・November, 2016: 1F washing face room remodeling construction (クチーナ company)
・December, 2016: Outward appearance (garden, exterior) remodeling construction
・June, 2017: 2nd floor washing face faucet replaced construction
・September, 2017: Building maintenance construction
・February, 2020: Building maintenance construction (for 2019)
・March, 2020: Drainage pipe high pressure washing construction
・August, 2023: Housing part replaced (to security glass replace)
・December, 2025: All the buildings air-conditioning system update, parts replaced, Boiler replaced (eco-one)
Read More Read Less