Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
288,000,000 JPY
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (entirely) (May, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (May, 2026) plan
■ Indoor reform enforcement (going to be completed in May, 2026)
* Flooring swap
* Cross swap
* System kitchen replaced made of Toklas
* Dresser replaced made of Toklas
* Bathroom replaced (スパージュ) made in LIXIL
* Restroom replaced made in LIXIL
* Floor tile replaced
* Eco-carat setting
Etc.
■ City Tower Azabu-juban ━━ ...
○ Sumitomo Realty & Development Co.,Ltd. original developer X Shimizu, Okumura construction JV
○ Directly basic X Vibration Control Structure
○ 2009 June
○ The skeleton infill method that the freedom of the reform works
○ The glass curtain wall adoption that beauty stands out
○ Full concierge service
○ Double glazing of the high insulation
○ 24-hour on-site management (※ night security)
* Pets allowed (use rules apply)
* It is dust Station available in each floor
■Common facilities (fees may be charged for some services) ━━ ...
* B1 floor: Coach entrance, kids' room, community hall
* The first floor: Grand lounge, concierge service, carriage porch
* The third floor: Guest room
* The 24th floor, the 25th floor: Skylounge
Read More Read Less