Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
578,000,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced
Interior (each room cross, floor, wall) (February, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (February, 2026) plan
■Recommended
○Tokyo Tower view
○Southwest, Northwest corner unit
○Renovation enforcement finished Properties (February, 2026 Complete)
・Flooring, wall, ceiling cross New swap
・Downlight, the indirect lighting New fixtures
・Air-conditioner replaced
・Bathroom, Dresser, kitchen, shower toilet, washing bread newly installed
・House cleaning etc.
■About condominium
○2014 February, Reinforced Concrete flat roof 22-story bldg.
○NTT URBAN DEVELOPMENT Corporation original developer
○KONOIKE CONSTRUCTION Co., Ltd. Tokyo head office construction
○There is a garbage place in each floor
○Good location of Azabudai Hills, the Toranomon Hills close
■Surrounding environment
○A 2-minute walk from Tokyo Metro Hibiya Line "Kamiyacho" station, an 8-minute walk from "Toranomon Hills" station
○Toei Mita Line "Onarimon" station: An 8-minute walk
○Toranomon, Azabudai redevelopment Area close
Read More Read Less