Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
128,000,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (November, 2025) plan I plan the part of floor, wall fixtures, the ceiling fixtures, housing part replaced (November, 2025), Interior (each room cross) (November, 2025) plan
-Recommended - of the Properties
▼Reform contents (going to be completed in the beginning of November, 2025)
・Kitchen replaced
・Bathroom replaced
・Washing face replaced
・Restroom replaced
・The part of floor/wall fixtures
・The ceiling fixtures
・Housing part replaced
・Wallpaper changed
・Boiler replaced
・Water supply and drainage pipe replaced (existing partly)
▼Characteristics of the condominium
・180 1998 March/Total Units
・With automoatic lock/security camera
・Delivery box available
・Pets allowed (rules apply)
▼Characteristics of the room
・4th floor part/Southwest Orientation dwelling unit
・Layout of exclusive area 55.86 square meters /1LDK+WIC
・About 3.0 quires of WIC available
■━━━━━ ... which helps with search for house you like
For property details or inquiries, feel free to contact us.
Read More Read Less